Estate Factory Backup, Nuwara Eliya

Nuwara Eliya, Sri Lanka

← All Projects
Estate Factory Backup, Nuwara Eliya — finished install
Array
22 kW
Bank
60 kWh
Inverter
20 kW
Commissioned
2025
01

The problem

Grid interruptions during the plucking season were stalling withering lofts mid-cycle, and a stalled loft costs a whole day's leaf.

02

What we built

A 22 kW roof and terrace array across two factory blocks, a 60 kWh bank in a purpose-built ventilated room, and 20 kW of hybrid inversion split across critical and non-critical boards.

03

The result

Withering and rolling now ride through every dropout. The estate reports no leaf loss to power failure across two full seasons.

Racking / bank detail
Commissioning

Bill of materials

Modules
38 × 580 W
Bank
12 × 5 kWh @ 48 V
Inverter
2 × 10 kW parallel
Racking
Roof rail + terrace frame
Monitoring
Per-string telemetry